… Tokunbo Wahab: SUP Ban Crucial for Environmental Preservation
by Babajide Fadoju
The Lagos State Government has reiterated its determination to implement a comprehensive ban on single-use plastics (SUPs) by the end of this month. This initiative is part of a broader strategy aimed at combating environmental pollution and enhancing waste management in the state.
The commitment was reaffirmed by Tokunbo Wahab, Commissioner for Environment and Water Resources, during an inspection tour of flood-prone areas on Lagos Island. The tour focused on assessing the impact of improper waste disposal on local infrastructure.
“There is no going back on a total ban of SUPs,” Wahab stated. “We are currently having conversations on how to phase them off. The enforcement will take effect before the end of January.”
SUP Ban Aligns with Global Environmental Goals
Single-use plastics, including styrofoam and disposable containers, are notorious for their role in environmental degradation. Their non-biodegradable nature contributes significantly to pollution, prompting the need for decisive action. Lagos State’s initiative aligns with global efforts to mitigate the environmental damage caused by plastic waste.
Wahab emphasized the government’s progress since the initial ban on SUPs was introduced in January 2024, particularly noting the reduction in styrofoam litter. The ongoing enforcement measures aim to consolidate these gains and ensure a cleaner, healthier environment for all residents.
During the tour, Wahab highlighted the detrimental effects of poor waste management on critical infrastructure. He pointed to issues at the Ilubirin pump station, where improper disposal practices have led to system blockages.
“In fairness to the government, infrastructure such as functional drainage, roads, and walkways were properly built under contract. However, the level of degradation due to bad human behaviour is alarming,” he remarked.
The commissioner further noted that the inspection was vital for ensuring that contractors are prepared to resume work and to evaluate whether project timelines could be expedited.